PROFESSIONAL Cookware Product Development
A high end cookware manufacture had the engineering and design firm I worked for redesign there cookware series. This includes 21 different pots and pans. Plus a water-less low pressure cooker lid. Product scheduled to go into production for multi-country release in 2017.
I led the engineering development of the product from concept, testing, to production support. Working closely with Industrial Design and other Mechanical Engineers, tasks that I did include concept generate, design specification packet (3D CAD, Drawing, and BOM), product requirement generation, build test fixtures, and design verification testing. Inventor on United States Patent Application # D853180